Risk Dashboards / Executive Overview
JT
Josh TatumExecutive Owner

Portfolio Risk Overview
11 active assets · Last refresh just now · Powered by NXTC AI

Live data
All Assets
Q2 2026
All Regions
Portfolio Overview
Action Items
Cost & Budget
Schedule
Outstanding Issues
AI Insights
Settings
Open Action Items
0
▲ 12 new this week · 4 critical
Cost at Risk
$0.0M
▲ $610K vs. last month
Missed Schedules
0 of 11
projects behind target
Outstanding Issues
0
▲ 3 high-severity · 11 in review
AI Risks Surfaced
0
Early-warning this month · before owner-impact

Missed SchedulesProjects projected to miss substantial completion · 3 of 11 active

Live

Portfolio Delay
42 days
Owner Exposure
$2.4M penalties
Recoverable
2 of 3 with action
Planned-completion timeline
Projected slip beyond plan
Avalon at Brookhaven312 units · Atlanta, GA · PM: M. Chen
+20 days
Planned

Aug 15

Forecast

Sep 4

Driver: Punchlist resolution velocity down 38% over 14 days. 11 open items remain; PM escalating to GC. AI projects substantial completion slip to mid-September without intervention.
Westgate Residences248 units · Charlotte, NC · PM: A. Patel
+14 days
Planned

Jul 22

Forecast

Aug 5

Driver: Subcontractor COI lapse stalled framing inspections for 6 days. Resequencing in progress; window assembly delivery is the new critical path.
Skyline Plaza Tower276 units · Nashville, TN · PM: L. Brooks
+8 days
Planned

Oct 10

Forecast

Oct 18

Driver: MEP/structural clash at Level 4 unresolved 11 days. Coordination call set; recoverable if resolution completes within next 5 business days.

Critical Open Action ItemsSorted by impact × urgency

View all 247

EIFS substrate moisture readings exceed threshold
Avalon at BrookhavenOwner: M. Chen
Overdue 3d
Punchlist deficiencies unresolved past close-out
Westgate ResidencesOwner: A. Patel
Overdue 1d
Window flashing inspection failed — rework required
Harborline LoftsOwner: R. Diaz
Due tomorrow
Subcontractor COI lapsed — concrete & framing
Skyline Plaza TowerOwner: L. Brooks
Due in 2d
Change order #214 pending owner approval > 14d
Riverbend Crossing$184K
Due in 4d
3rd-party envelope consultant report under review
Northpark CommonsOwner: J. Tatum
Due in 9d

Cost Overrun — Top ExposuresCommitted budget vs. current forecast at completion

$4.2M total exposure

Avalon Brookhaven$12.4M
+$840K+6.8%
Westgate Residences$9.8M
+$612K+6.2%
Harborline Lofts$7.2M
+$430K+6.0%
Skyline Plaza$14.1M
+$390K+2.8%
Riverbend Crossing$8.4M
+$285K+3.4%
Northpark Commons$9.8M
On budget

Outstanding IssuesShowing 6 of 18 · sorted by severity

18 total

CriticalOpen 14d
Water intrusion at SW corner — Building 3
Avalon at Brookhaven
M. ChenInvestigation underway
CriticalOpen 8d
EIFS substrate moisture above 19% spec limit
Avalon at Brookhaven
M. ChenSub mobilized
CriticalOpen 5d
Structural crack reported in podium slab pour #47
Harborline Lofts
R. DiazEOR review
HighOpen 22d
Punchlist deficiencies past close-out
Westgate Residences
A. PatelLegal notified
HighOpen 11d
MEP/structural clash unresolved — L4
Skyline Plaza Tower
L. BrooksCoordination call set
MediumOpen 16d
Change order #214 owner approval pending
Riverbend Crossing
$184K impactAwaiting owner

AI Predictive InsightsPatterns surfaced from field reports, inspections & consultant documents

Analyzed 14,318 documents · updated 4 min ago

92% confidence
Repeat sealant failures concentrated in Q3 deliveries
Six of the last eight sealant-related defect reports came from buildings delivered between Jul–Sep. Suggests humidity-related cure issues. Recommend QA hold-points on summer pours.
Evidence: 14 consultant reports · 3 affected assets
87% confidence
Avalon Brookhaven punchlist trend predicts 3–4wk delay
Velocity of punchlist resolution has dropped 38% over the last 14 days. Historical baseline suggests substantial completion slips to mid-July without intervention.
Evidence: Daily logs · subcontractor manpower · 9-mo. baseline
78% confidence
Same EIFS sub appears in 4 of top 6 cost overruns
Pattern detected across consultant findings and change-order narratives. Worth reviewing scope clarity and pre-bid prequalification before next 3 awards.
Evidence: 22 change orders · 4 envelope reports
📥
Reports Ingested
14,318
Last 30 days
Systems Connected
7
Procore · Autodesk · SharePoint · +4
Time to Insight
3.2 min
Down from 4.2 days manual
Risks Surfaced Early
142
This quarter · before owner-impact