Portfolio Risk Overview
11 active assets · Last refresh just now · Powered by NXTC AI
Live data
All Assets
Q2 2026
All Regions
Portfolio Overview
Action Items
Cost & Budget
Schedule
Outstanding Issues
AI Insights
Settings
Open Action Items
0
▲ 12 new this week · 4 critical
Cost at Risk
$0.0M
▲ $610K vs. last month
Missed Schedules
0 of 11
⚠ projects behind target
Outstanding Issues
0
▲ 3 high-severity · 11 in review
AI Risks Surfaced
0
Early-warning this month · before owner-impact
Missed SchedulesProjects projected to miss substantial completion · 3 of 11 active
Live
Portfolio Delay
42 days
Owner Exposure
$2.4M penalties
Recoverable
2 of 3 with action
Planned-completion timeline Projected slip beyond plan
Avalon at Brookhaven312 units · Atlanta, GA · PM: M. Chen
+20 days
Planned
Aug 15
Forecast
Sep 4
Driver: Punchlist resolution velocity down 38% over 14 days. 11 open items remain; PM escalating to GC. AI projects substantial completion slip to mid-September without intervention.
Westgate Residences248 units · Charlotte, NC · PM: A. Patel
+14 days
Planned
Jul 22
Forecast
Aug 5
Driver: Subcontractor COI lapse stalled framing inspections for 6 days. Resequencing in progress; window assembly delivery is the new critical path.
Skyline Plaza Tower276 units · Nashville, TN · PM: L. Brooks
+8 days
Planned
Oct 10
Forecast
Oct 18
Driver: MEP/structural clash at Level 4 unresolved 11 days. Coordination call set; recoverable if resolution completes within next 5 business days.
Critical Open Action ItemsSorted by impact × urgency
Cost Overrun — Top ExposuresCommitted budget vs. current forecast at completion
$4.2M total exposure
Avalon Brookhaven$12.4M
+$840K+6.8%
Westgate Residences$9.8M
+$612K+6.2%
Harborline Lofts$7.2M
+$430K+6.0%
Skyline Plaza$14.1M
+$390K+2.8%
Riverbend Crossing$8.4M
+$285K+3.4%
Northpark Commons$9.8M
On budget—
Outstanding IssuesShowing 6 of 18 · sorted by severity
18 total
CriticalOpen 14d
Water intrusion at SW corner — Building 3
Avalon at Brookhaven
M. ChenInvestigation underway
CriticalOpen 8d
EIFS substrate moisture above 19% spec limit
Avalon at Brookhaven
M. ChenSub mobilized
CriticalOpen 5d
Structural crack reported in podium slab pour #47
Harborline Lofts
R. DiazEOR review
HighOpen 22d
Punchlist deficiencies past close-out
Westgate Residences
A. PatelLegal notified
HighOpen 11d
MEP/structural clash unresolved — L4
Skyline Plaza Tower
L. BrooksCoordination call set
MediumOpen 16d
Change order #214 owner approval pending
Riverbend Crossing
$184K impactAwaiting owner
✦
AI Predictive InsightsPatterns surfaced from field reports, inspections & consultant documents
Analyzed 14,318 documents · updated 4 min ago
92% confidence
Repeat sealant failures concentrated in Q3 deliveries
Six of the last eight sealant-related defect reports came from buildings delivered between Jul–Sep. Suggests humidity-related cure issues. Recommend QA hold-points on summer pours.
Velocity of punchlist resolution has dropped 38% over the last 14 days. Historical baseline suggests substantial completion slips to mid-July without intervention.
Pattern detected across consultant findings and change-order narratives. Worth reviewing scope clarity and pre-bid prequalification before next 3 awards.
Evidence: 22 change orders · 4 envelope reports
📥
Reports Ingested
14,318
Last 30 days
⚙
Systems Connected
7
Procore · Autodesk · SharePoint · +4
⌛
Time to Insight
3.2 min
Down from 4.2 days manual
⚠
Risks Surfaced Early
142
This quarter · before owner-impact
DemoIllustrative example for the NMHC discussion on AI-driven risk visibility. Built by NXTC Technologies in partnership with BECI.